五月的婷婷超碰无码国产片|91久久视频在线观看|高清无码无需登录免费成人片|亚洲一级三级在线观看|婷婷久久综合超碰|欧美日韩亚洲国产另类|欧美色乱视频人人香蕉久久|久草观看视频无码无码|免费看A黄色大片|欧美美女A级视频

CRGO Core Lamination & Cutting Line SRJD400-214G

SI RUI
  • Case

     

    High-Precision CRGO Core Cut-to-Length Line for Transformer Manufacturing

    Location: United States (North America)

    Industry: Power Transformer & Electrical Equipment

    Key Performance Results

    • Production Throughput Increased by 35%
    • Dimensional Accuracy Achieved: ±0.02mm
    • Equipment Uptime: 99.8%
    • Manual Labor Cost Reduced by 40%
    Completion Date: Q2 2025

This production line is an intelligent CRGO core lamination and cutting system, comprising an unwinding system, material feeding & cutting system, pin-positioning & pre-stacking system, robotic CRGO core lamination system, and electrical control system. It enables simultaneous stacking and lamination of 2 CRGO cores in full “E” shape or “E+I” shape.

Unwinding System

The unwinding system features a 4-head decoiler, supporting coil strips of various widths for CRGO core cutting and lamination, with hydraulic tensioning. An infrared positioning mechanism is integrated after coil selection, and coil loading is designed without a buffer pit. Multiple sets of photoelectric switches control line speed, with flexible buffer acceleration/deceleration for smooth operation.

Material Feeding & Cutting System

The material feeding and cutting system adopts a centralized positioning mechanism, equipped with a complete tooling set (2 shears, 5 V-notching tools, and punching tools):

  • 1×450° and 1×1350° straight shearing tools
  • 1 servo-controlled V-notching tool for transverse and longitudinal movement
  • 4 servo-controlled hole-punching tools for longitudinal movement, with automatic adjustment based on sheet length

The line operates in synchronous shearing/cutting mode, allowing the V-notching tool and hole-punching tools to run simultaneously. Metal scrap generated during cutting is centrally collected via a dedicated conveyor system.

Pin-Positioning & Pre-Stacking System

The pin-positioning pre-stacking system uses magnetic reverse suction and pin-positioning principles to enable intelligent step-lap pre-stacking. Photoelectric sensors monitor operation, triggering an immediate error stop for anomalies such as sheet misalignment, missing pins, or displacement.

Robotic CRGO Core Lamination System

The robotic lamination system is equipped with dual robotic arms to maximize operational efficiency, eliminating idle time for the cut-to-length equipment. Dedicated core lamination tables are mounted on raceway frames on both sides of the pre-stacking unit, with customizable frame lengths. This design ensures uninterrupted operation during workstation switching, even when laminating 4+ CRGO cores simultaneously. Positioning pin mechanisms on the raceway frames guarantee consistent accuracy across workstation changes.

Electrical Control System

The electrical control system includes a remote communication portal, enabling remote diagnosis and program upgrades when workshop network conditions allow. The electrical control cabin is fitted with a dedicated air conditioner for stable operation. A dedicated conveyor belt is also integrated for efficient metal scrap transfer.

Get in Touch

Have a project in mind?
Send your specs and we’ll connect you with the right engineer.